- [Question] Same conduit for plug and stove
- Load profiling and data logging
- New plugs in old home with metal conduit
- Finders fees
- Emergency ( loadshedding ) lamps.
- Inverter or online UPS
- Lithium batteries
- Taxes and overheads
- 3 Phase changeover for inverter + aux output
- [Question] The size Electrical Cables required to supply 50 households?
- Eskom contact to sort high Earth loop
- Fibre and network cables in electrical wireways
- Test report/COC
- Solar installation related
- Solar maintenance
- Inverter supply main switch not in DB
- Sunsynk app
- SABS/SANS Approval
- Small main breaker to safe electricity
- Kitchen sink bonding
- Application as a registered person with DOL
- Backup system earth electrodes
- Safety gear
- Lightning protection and/or bonding
- Double insulated solar wires in wireways
- DC combiner or control box
- Metering rooms in building?
- Backup system maintenance intervals
- Prepaid meter problem with solar power
- MAJOR TECH test equipment
- Solar backup system challenges
- Solar inverters and batteries and so many choices
- Golf cart solar panel
- Lithium battery installation discussion
- Complex carport lights
- To coil or not.
- Sunsynk customer service
- [Question] Voltage reading between supply live and disconnected load neutral
- Solar panel design and installation
- Understanding Sunsynk inverters
- City Power breaker tripping
- eThekwini domestic solar registrations
- water heaters and inverters
- What amps should stove breaker be?
- UPS vs Inverter
- Working in unsafe locations
- Earth leakage problem. Help.
- How to wire a circuit breaker
- Feeding back into grid.
- IP CCTV challenges
- Sunsynk new warranty document
- Load shedding free for a month
- Vat time again
- Cat 5e vs cat 6
- Tradesmen salaries
- Safety regualtions
- When is a good time to buy and install solar
- EV charger installation standards.
- Neutral/earth bridging method.
- Solar challenges
- Electrical Report for insurance
- The silly euro plug solutions
- ELI Way out of Spec
- PV Suppliers?
- A big thank you.
- [Question] COC/Test report a legal document
- Buying directly from the supplier
- Tragedy, is it the law's fault?
- Socket outlets 3 phase - ELU
- Sunsynk 5.3 kwh lithium batteries
- Cat 6 max voltage
- Solar loan application
- CCTV installations
- CCTV network installation
- [Question] Good Morning
- Installation rules scope
- How to grow a small electrical business
- Calculate for full load conditions
- Solar panel design
- Light switch.
- Inverter pass through current
- [Question] How you deal with invalid/ non compliant COC's
- How do we protect the public from the electrical industry
- [Question] Aerial Cable
- DOL and AIA
- Pool light transformer
- How to complete a COC/test report
- Can internet optic fibre be installed in an electrical wireway?
- Inverter and battery install
- Current carrying capacity for DC cabling
- Social media and electrical
- Sunsynk 12 KW 3 phase inverter
- New South African plug standard
- Safe solar installs
- The ideal solar setup
- [Opinion] A good time to buy solar
- That time has come again
- [Question] Correct Cable Sizing
- PVC Conduit quality/ bending issues
- Inverter sizing mystery
- Non payer
- [Question] Earthing a metal back box
- Bargaining council rates?
- SANS 10142-1 ED3.2
- Software for drawing single line diagrams
- [Question] Overhead cabling to outside building question
- Who may design and sign off on SSEG
- Need help choosing a mains supply cable
- Inverter Sub DB
- DOEL registration
- Neutral/earth bond Sans 10142
- Pop up socket outlets.
- Surprise, surprise.
- Bargaining Council - Again
- Aircon circuit. Conductor and breaker size ?
- SPD rating
- Industrial 3 phase pressure washer - earth leakage.
- Gate motor circuit
- Cooker hood connection
- Electricity meter upgrade confirmation
- High Bays - feed back
- Douggie - LED flicker
- Electrical contractor registration
- Touch Voltage
- Electrical contractor registration procedure (Gauteng)
- Inverter COC
- Charge rates
- Is this outside fuse box legal?
- Merry Christmas
- Electrical contractor work redo process and costs
- Happy New Year
- Inverter part of installation or not ?
- Notification of danger Annexure form
- Geyser too close to DB?
- Stove isolator positioning.
- Statement "It is not worth studying for an electrician"
- ECASA lost the plot?
- DOL registration validity.
- Extending 16mm2 cable
- Number of test reports for a grid-tie inverter SSEG
- 3 Phase PSCC testing.
- Unplugging cellphone chargers
- Kettle tripping smart meter
- Single phase tester
- LED lights
- Hubble batteries
- Grid failures in suburbs
- Fuse selection for solar panel DC control boxes
- Fuse and cable selection for batteries used in backup systems.
- Tough times ahead.
- Colour of neutral
- Neutral earth bonding
- DC cabling in metal wireways
- Lithium battery installation
- VIR and the ECASA
- A few challenges in electrical industry
- Smart energy metering
- Process for creating your own COC numbers
- Time for PV professional qualification vs electrician qualification?
- Product warranties support
- Single phase tester and PV installations ACASA Magazine April May