Results 1 to 10 of 16

Thread: CoC requirements for Solar Water Heating installations

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11
    Gold Member Sparks's Avatar
    Join Date
    Dec 2009
    Location
    Port Elizabeth
    Posts
    909
    Thanks
    21
    Thanked 127 Times in 96 Posts
    The ECA have got it wrong! Replacing a faulty socket outlet, circuitbreaker or lightswitch does not require certification. That is routine maintenance. It would be difficult to do it without "touching" the installation. Certification is required when an installation is altered or upgraded. Upgading a DB or installing (not replacing) points of consumption are required to be certified.

    How many ECA staff does it take to change a light bulb?

  2. Thanks given for this post:

    AndyD (13-Aug-10)

Similar Threads

  1. new water meter
    By murdock in forum General Chat Forum
    Replies: 18
    Last Post: 15-Oct-10, 10:16 PM
  2. Reducing Costs-Any tips?
    By sterne.law@gmail.com in forum Energy and Resource Conservation Forum
    Replies: 16
    Last Post: 23-Sep-10, 01:36 PM
  3. How many hot-water geysers are sold each year?
    By desA in forum General Business Forum
    Replies: 32
    Last Post: 06-Sep-10, 07:46 PM

Did you like this article? Share it with your favourite social network.

Did you like this article? Share it with your favourite social network.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •