    Was wondering, is it at all possible to tamper with the db board wiring to 'slow down' a prepaid sub-meter. I suspect one of my tenants had some fiddling done as readings ar suddenly much lower than usual consumption and nothing has changed ito what is plugged in/used in the premises.

  2. #2
    Platinum Member Derlyn's Avatar
    Join Date
    Mar 2019
    Location
    East london
    Posts
    1,629
    Thanks
    116
    Thanked 153 Times in 145 Posts
    Yes it is posśble.

  3. #3
    Silver Member
    Join Date
    Jan 2021
    Location
    Orania
    Posts
    237
    Thanks
    13
    Thanked 21 Times in 19 Posts
    The easy answer is yes, it can happen, but there can also be other reasons for the change in consumption.

    I was at a house recently that had a changeover on the prepaid. Part of the month they run on the prepaid meter, and part of the month they don't.
    Also, the user might have been gone on holiday, hence a lower reading. A constant lower reading might be due to tampering or a change in consumption habits.
    I have clients that have a control meter before the prepaid meter. They compare the control meter units with the prepaid meter units and can easily see if something is fishy.

  4. #4
    Gold Member
    Join Date
    Jun 2020
    Location
    Fourways
    Posts
    771
    Thanks
    121
    Thanked 35 Times in 34 Posts
    How does one slow down the meter ?

    Racking my brain and only was I can think is to tap into the supply side some cables and run a load ? Other than that I am not sure haha

    Sent from my CPH2197 using Tapatalk

  5. #5
    Platinum Member Derlyn's Avatar
    Join Date
    Mar 2019
    Location
    East london
    Posts
    1,629
    Thanks
    116
    Thanked 153 Times in 145 Posts
    The most common monkey business is to put a bridge piece across the input and output of the meter with a wire so some of the load goes through the meter and some through the bridge.

    Easy to detect.

    Switch on a light. Turn the meter off and if the light is still on, the meter has been bridged.

  6. #6
    Gold Member
    Join Date
    Jun 2020
    Location
    Fourways
    Posts
    771
    Thanks
    121
    Thanked 35 Times in 34 Posts
    Ahhh yes ok, seen that before! Newly installed sub meter, client calls to say they only paid R60 in 2months and had just moved in!

    Went to go look and a nice little 2.5mm bridging the line in and out.

    Easy to pick up visually but I was thinking maybe something else non visible maybe happens to slow It down

    Sent from my CPH2197 using Tapatalk

  7. #7
    Platinum Member Derlyn's Avatar
    Join Date
    Mar 2019
    Location
    East london
    Posts
    1,629
    Thanks
    116
    Thanked 153 Times in 145 Posts
    I notice the new sub meters now have a transparent cover over the terminals so now it's quite easy to see minkey business on the terminals but not in the past.

    I doubt if there is a way of slowing down a meter.

  8. #8
    Platinum Member
    Join Date
    Jun 2017
    Location
    Port Elizabeth
    Posts
    1,363
    Thanks
    38
    Thanked 323 Times in 271 Posts
    There are ways to slow down meters on credit disc type and prepaid
    There are some guys running around charging for it which is why municipalities are losing revenue

  9. #9
    Silver Member
    Join Date
    Jan 2021
    Location
    Orania
    Posts
    237
    Thanks
    13
    Thanked 21 Times in 19 Posts
    The old wheel meters had a bridge, if you remove it the meter stop working. One week on and one week off saves you half your bill. With the new electronic meters it is a bit more difficult

Similar Threads

  1. Moving a distribution board.
    By Leslie Clark in forum Electrical Contracting Industry Forum
    Replies: 1
    Last Post: 08-Oct-17, 02:26 PM
  2. [Question] Distribution Board Labelling
    By ursi in forum Electrical Contracting Industry Forum
    Replies: 14
    Last Post: 15-Sep-16, 12:51 AM
  3. [Question] Fused distribution board
    By pes in forum Electrical Contracting Industry Forum
    Replies: 5
    Last Post: 11-Aug-13, 08:01 AM
  4. Distribution board over toilet
    By Dave A in forum Electrical Contracting Industry Forum
    Replies: 8
    Last Post: 26-Jul-12, 09:22 PM
  5. Distribution Board regulations
    By Duncan in forum Electrical Contracting Industry Forum
    Replies: 2
    Last Post: 28-Feb-11, 09:03 AM

Did you like this article? Share it with your favourite social network.

Did you like this article? Share it with your favourite social network.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •