I have an issue where a Client is questioning three compliancy issues and would like to firstly know your opinion on what you would install (or not install) and secondly the actual SANS code or section that states these issues.
1) Must you use separate conduits and/or drawboxes if you are running separate circuits (different breakers in DB)
2) If i have a DB that has Normal and Generator sections, can I run the cabling for emergency section through the Normal load section. (Use DB as a wireway).
3) Must a plug in a house have a switch or can it be unswitched.