Results 1 to 10 of 13

Thread: Jhb City Power Contractors

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Full Member
    Join Date
    Jul 2015
    Location
    Jouburg
    Posts
    40
    Thanks
    0
    Thanked 3 Times in 3 Posts
    Click image for larger version. 

Name:	2018-07-17 10.45.05 (Small).jpg 
Views:	934 
Size:	41.0 KB 
ID:	7192
    CP staffer stripping GP wire for fuses


    Click image for larger version. 

Name:	2018-07-17 10.44.47 (Small) (Small).jpg 
Views:	934 
Size:	43.9 KB 
ID:	7193
    Flashy new CP truck in front of neglected sub station


    Click image for larger version. 

Name:	2018-07-24 13.40.50 (Small).jpg 
Views:	939 
Size:	74.0 KB 
ID:	7194
    Contractor replacing burnt out underground cable

  2. #2
    Full Member
    Join Date
    Jul 2015
    Location
    Jouburg
    Posts
    40
    Thanks
    0
    Thanked 3 Times in 3 Posts
    And yea, the power pooped at 19h30 again tonight after being restored at 15h30 with Voltage slipping and sliding all the way down to 190V before hitting 450mV, not much I can do with that!

    I suspect that underground cable has gone foobar again, since all the phases seem to be out.

Similar Threads

  1. Need some help with JHB City Water
    By Dave S in forum The Whistleblower Forum
    Replies: 0
    Last Post: 16-Sep-13, 07:12 AM

Did you like this article? Share it with your favourite social network.

Did you like this article? Share it with your favourite social network.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •