What is the big deal with this supplementary COC.
If I didn't have to work on the site, I would have just smiled, and kept walking, because
Sorry. I read it as 500 metres, hence my comment about crossing roads.
Derlyn Today, 12:28 AMI would check the cable manufacturers instructions regarding surfix as an aerial installation. I'd suggest rather use steel conduit, not PVC for overhead
AndyD Today, 12:01 AMSANS 10142 doesn't say much about aerial conductors other than
6.3.4.1
An aerial conductor shall be of a) hard-drawn copper, b) stranded
How you deal with invalid/ non complaint COC's
Tapping into the main cable after the meter to feed a sub db is not allowed as you will be bypassing the point of control.
Derlyn Today, 10:31 AM