I was wondering why an PR engineer would have to check an elctrical installation that has already been checked by an IE or MIE.
Thank goodness
I Take it that SANS 60364-7-712 will come into play as well
Try twist there arms to get to no PR sign off up to 350Kw peak which is the
Sounds like feedback from the meeting I attended on Tuesday 4th June 2024.
Some of the details still need to be finalised, hence the embargo
Tapping into the main cable after the meter to feed a sub db is not allowed as you will be bypassing the point of control.
Derlyn Yesterday, 10:31 AM
eThekwini domestic solar registrations
The threshold for grid studies is the point under consideration at the moment
Dave A Yesterday, 04:12 PMSame thought crossed my mind.
We've been