The idea of this thread is to guide people in the right direction, with regards to COC/test reports.
Scope of work:
1/ Rewire
The transformer is right below a sub db and the pool pump connects to that same sub db so all within 1.5m the sub db has a double pole main switch like
Die sparky Today, 10:11 AMIf you get caught, like I a have said in the past, its a numbers game, you do 350 installation and get caught for 1, no big deal. You really have to mess
Isetech Today, 08:22 AMIn the cases that I am aware of , where an AIA was called out , the contractor that was taken to task had to pay the AIA and rectify that faults and pay
GCE Today, 06:56 AM
How to complete a COC/test report
Before I look at the COC document, I create a sketch of the property and as I do the visual inspection, then mark all the electrical points and make