I would like to ask some advice, from a COC POV.
A "SR690C geyser controller" needs to be plugged into a plug point, and then drive a geyser. This doesn't quite sound right to me but it's a popular solar geyser controller.
Now, the question, since the control unit it plugged into the wall socket, it has an earth, and then a new cable runs from the unit into the roof, into the geyser element - which can't be more than 2KW.
Is this acceptable? I know it won't pass a COC, but since it's now on a plug point, would it need to? The geyser is probably about 8m away from the plug, as the wire runs up along the wall, into the roof, along the trusses.
Here's the PDF manual: http://www.solarenergygroup.co.za/fi...20SR609C-1.pdf
And this is what is looks like: https://www.alibaba.com/product-deta...804667964.html
Did you like this article? Share it with your favourite social network.