i need some clarity about what point the coc covers...

from the db to a control box to the motor?

from the meter to the mains switch to the control panel to the emergency stop button on a conveyor?

all the cabling from a control panel on a machine to all the components on a machine?

to all the cables fed from a control box to all the cables supplying components all over a building....like motors...e/stops...sensors.