First you you need to understand the application.
1/ Generator connected with auto stop/start, using the aux and the SOC or voltage to control.
2/ Generator connected to with manual stop/start, used as a backup to top up, in case of a grid power failure. Smart people would have already had an industrial plug top installed at the meter with a changeover switch in a small DB next the meter, box since load shedding started back in 2009. Since load shedding hit stage 6, more and more people are installing solar systems with inverters.
The Sunsynk inverter has an aux, which can be setup for various application. What do you need to know before you plug in connect and fire up the generator?