    CoC for alternative power installation

    Friend of mine had a generator installed and asked me for an opinion on the installation. The cross over switch and general installation were top notch.

    My friend asked me if he needed a CoC: - he said the genset installer would give him a CoC for the installation.

    I understand any alternative power installation forms part of the CoC for the entire installation - there isn't a CoC for the genset installation only?

    Interested to see what he is given.

  2. #2
    Silver Member
    Join Date
    Jul 2008
    Location
    Germiston, South Africa
    Posts
    404
    Thanks
    25
    Thanked 47 Times in 43 Posts
    The only way forward for the installer is for him to verify his installation, PROVIDED he is satisfied that the the installation that he is adding to is compliant.
    Now, how does one satisfy themselves that the existing installation is compliant?
    The only way is to inspect it, surely.
    And, if any faults are found on the existing installation, then they must be rectified.
    If the installer now does the rectification on the existing installation then he takes responsibility for the entire installation and has to issue a full certificate.
    That's my take on this.

    Sent from my SM-A528B using Tapatalk
    To make a mistake is human, to learn from that mistake is knowledge and knowledge is strength.

  3. #3
    New Member
    Join Date
    Mar 2022
    Location
    Johannesburg
    Posts
    5
    Thanks
    1
    Thanked 1 Time in 1 Post
    Quote Originally Posted by Andrew_van_Zyl View Post
    Friend of mine had a generator installed and asked me for an opinion on the installation. The cross over switch and general installation were top notch.

    My friend asked me if he needed a CoC: - he said the genset installer would give him a CoC for the installation.

    I understand any alternative power installation forms part of the CoC for the entire installation - there isn't a CoC for the genset installation only?

    Interested to see what he is given.
    I had a request to install a generator and issue a COC the other day. I refused to do the installation as the generator was a V-0-V generator (most generators are of this configuration).
    Read regulation 7.12.2.7

  4. Thanks given for this post:

    Andrew_van_Zyl (18-Apr-22)

  5. #4
    Bronze Member
    Join Date
    Mar 2022
    Location
    Little Falls, Roodepoort
    Posts
    131
    Thanks
    60
    Thanked 10 Times in 9 Posts
    LeeCatt I agree fully.
    Thats why the CoC has a section for alternative power.
    As it is I've spent 2 days resolving issues with this house and I am still not finished. Biggest time user was finding causes of IR failure.
    So the installer would definitely not had a clear pass (if he inspected it).

    Thank you for your comment

Similar Threads

  1. COC & Alternative power
    By Tonye in forum Electrical Contracting Industry Forum
    Replies: 6
    Last Post: 25-Aug-16, 10:38 PM
  2. Testing an exisitng installation without power
    By ians in forum Electrical Contracting Industry Forum
    Replies: 9
    Last Post: 07-Sep-12, 09:43 PM
  3. Alternative to Big Mac Index
    By Marq in forum Business Finance Forum
    Replies: 2
    Last Post: 01-Sep-09, 03:38 PM

Did you like this article? Share it with your favourite social network.

Did you like this article? Share it with your favourite social network.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •