    standby generators

    can someone please send me details of a company which is selling SABS approved standby generators...and a complete sabs approved standards for standby generators...as i only have the guide lines and SABS 7.12 which do not clearly indicate the correct proceedure as to how a stabndby generator should be connected...with details about were the supply should be connected before or after the main isolator...where the AMF panel should be installed and where the ATS panel should be installed....how to connect into the main DB if an additonal essential/standby DB is not used...and you dont want the entire DB to be fed from the generator?

  2. #2
    Site Caretaker Dave A's Avatar
    Join Date
    May 2006
    Location
    Durban, South Africa
    Posts
    22,648
    Thanks
    3,304
    Thanked 2,676 Times in 2,257 Posts
    Blog Entries
    12
    Quote Originally Posted by murdock View Post
    how to connect into the main DB if an additonal essential/standby DB is not used...and you dont want the entire DB to be fed from the generator?
    Murdock, if you're passing by my neck of the woods, feel free to stop by and see how we've done it on our own premises.

    We can compare notes on the regulatory issues and maybe come up with something reasonably definitive. I'd also love to have someone outside of the company pass a critical eye over the way we've rigged it.

    We've also done a full factory backup generator install - a fully automated 250 amp 3 phase deal. Perhaps we can chew the fat over that one too.

  3. #3
    Suspended
    Join Date
    Oct 2007
    Posts
    2,346
    Thanks
    0
    Thanked 254 Times in 209 Posts
    i am just interested because i read an article in the highway mail "DEATH SPARKS CITY GENERATOR ALERT"...and this article indicates that you have to get a COC and the genarators has to be SABS approved...so i contacted the company which has their product CHOICE POWER om display but unfortunately they cannot give me their SABS spec sheet nor a COC because their are no regulations only guide lines for generators...i unfortunately will not issue a COC for any generators i install because in fact you cannot... unless you have a SABS approval for the generator and ATS panel...when you fill in the section which asked is the installation including all the components comply with SANS 0142 how can you fill in yes??? most of the imported ATS panels are not SABS approved in fact not one i has seen since this whole fiasco started.

  4. Thanks given for this post:

    ericlowry (09-Nov-12)

  5. #4
    Full Member
    Join Date
    Jan 2011
    Location
    midvaal
    Posts
    32
    Thanks
    3
    Thanked 0 Times in 0 Posts
    When doing the cabling for a standby genset including the changeover panel, would it be OK to sign off on the wiring and to exclude the genset unit?
    E

  6. #5
    Gold Member Sparks's Avatar
    Join Date
    Dec 2009
    Location
    Port Elizabeth
    Posts
    890
    Thanks
    20
    Thanked 127 Times in 96 Posts
    If you are happy to certify that you connected "non-SANS aproved" equipment to the installation, by all means feel free to go right ahead.

Similar Threads

  1. Connecting backup generators to existing electrical installation
    By Kevin Stubbs in forum Electrical Load Shedding Forum
    Replies: 35
    Last Post: 20-Jan-16, 07:28 PM
  2. And the lights go out again.
    By Dave A in forum Electrical Load Shedding Forum
    Replies: 71
    Last Post: 25-Feb-08, 04:38 PM

Did you like this article? Share it with your favourite social network.

Did you like this article? Share it with your favourite social network.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •