I am re-designing a shop in a mall. The current geyser is in the ceiling space, and I have to re-position the DB to a position directly underneath the geyser. The ceiling will be removed, and the top of the DB will be approximately 2 m below the drip tray.
Is this allowed? If not, how far and in what direction away from the geyser must I re-position the DB?

Thanks